EN TR
Discuss Your Project
Completed Nicosia · Industrial

SBC Boru — energy monitoring on the production lines

Every line is metered separately at a pipe plant, with consumption and solar production followed from one dashboard.

Three-phase energy meter mounted beside the contactors inside the panel

Project Overview

Location
Nicosia
Scale
Plant-wide, metering line by line
Category
Industrial
Year
2025
Type
Retrofit & Modernisation
Status
Completed

Watt Works Scope

  • Implementation
  • System Integration

Brands & Technologies Used

  • Shelly
  • Siemens

Systems & Applications

Highlighted systems were delivered in this project; grey ones were out of scope. Select a system to see its applications.

  • Lighting Not in scope

    Switching, dimming, scenes, automatic and presence control

  • Climate Control Not in scope

    HVAC/VRF, room control, underfloor heating, fan-coil, climate scenes

  • Curtains & Shading Not in scope

    Curtains, blinds, group/position control, weather automation

  • Security & Safety Not in scope

    Alarm, smoke, leak, access, smart locks, CCTV integration

  • Control & Visualisation Not in scope

    Smart switches, touch panels, apps, web visualisation and monitoring

  • Automation & Remote Access Not in scope

    Scenes, timers, logic, notifications and monitoring

  • Energy Management In this project

    Metering, load management, PV and EV integration

  • Intercom & Access Not in scope

    Video/IP intercom, lift and gate integration, RFID/PIN/biometric access

  • Audio & Video Not in scope

    Multi-room audio, cinema, AV control and outdoor audio

  • Network & Infrastructure Not in scope

    Structured cabling, managed network, Wi-Fi, PoE and VLAN

  • Industrial Automation In this project

    PLC, HMI, motor/pump control, Modbus, process automation and SCADA

The Challenge

Electricity use at the plant was visible only as a single total; how much each production line drew was unknown. The operator wanted per-line consumption and the site's solar production followed from one place.

The existing machine panels and switchgear were to stay as they were. The metering hardware was planned to be added onto the existing supply lines inside a working production facility.

The Watt Works Solution

We fitted a three-phase energy meter into the panel on each line's supply. Current measurement cables were run to the outputs of the existing breakers, the measurement leads were gathered on a separate terminal group, and the meters were connected to the network from inside the panel. Lines, co-ex units and the mixer were each named individually.

The data is collected in a single monitoring dashboard. The operator sees live power, daily and monthly consumption per phase, solar production and energy exported to the grid on the same screen, from a phone or a computer.

Engineering Highlights

  • Three-phase metering line by line
  • Installed into existing panels while production continued
  • Live power plus daily and monthly consumption
  • Solar production and grid export on the same screen
  • Remote monitoring from phone and computer

Project Gallery

More like this

Completed
Kyrenia · Two air handling units and one exhaust line, five variable frequency drives · Industrial

Kardeşler Fırın — ventilation automation and control panel

The bakery's two air handling units and exhaust line run from a single control panel, with speed control and fault tracking on a local touch panel.

Watt Works Scope: Implementation · Programming & Commissioning · System Integration
  • Climate Control
  • Automation & Remote Access
  • Control & Visualisation
  • Industrial Automation
View Project: Kardeşler Fırın — ventilation automation and control panel