EO Villa — migration from legacy automation to KNX

The villa's existing bus-based automation was migrated to KNX; lighting, blind control and app access now run on a single backbone.

The villa's distribution panel rebuilt with KNX modules, door open

Project Overview

Location
Yenikent, Nicosia
Scale
26–100 KNX devices
Category
Residential
Year
2025
Type
Retrofit & Modernisation
Status
Completed

Watt Works Scope

  • Implementation
  • System Integration
  • Programming & Commissioning

Brands & Technologies Used

  • KNX
  • Schneider Electric
  • Inspinia

Systems & Applications

Highlighted systems were delivered in this project; grey ones were out of scope. Select a system to see its applications.

  • Lighting In this project

    Switching, dimming, scenes, automatic and presence control

  • Climate Control Not in scope

    HVAC/VRF, room control, underfloor heating, fan-coil, climate scenes

  • Curtains & Shading In this project

    Curtains, blinds, group/position control, weather automation

  • Security & Safety Not in scope

    Alarm, smoke, leak, access, smart locks, CCTV integration

  • Control & Visualisation In this project

    Smart switches, touch panels, apps, web visualisation and monitoring

  • Automation & Remote Access In this project

    Scenes, timers, logic, notifications and monitoring

  • Energy Management Not in scope

    Metering, load management, PV and EV integration

  • Intercom & Access Not in scope

    Video/IP intercom, lift and gate integration, RFID/PIN/biometric access

  • Audio & Video Not in scope

    Multi-room audio, cinema, AV control and outdoor audio

  • Network & Infrastructure Not in scope

    Structured cabling, managed network, Wi-Fi, PoE and VLAN

  • Industrial Automation Not in scope

    PLC, HMI, motor/pump control, Modbus, process automation and SCADA

The Challenge

The villa was running a closed, bus-based automation system. It was not open to expansion, and maintenance or changes had become increasingly difficult over time. The owner wanted to move to an infrastructure that is more stable and supportable in the long run.

The second condition was that day-to-day use should not change. The wall switch layout had to stay as it was, and no walls were to be opened for a new cabling scheme. The migration therefore had to work largely over the existing installation.

The Watt Works Solution

We removed the old automation modules from the panel and built a new distribution based on Schneider Electric KNX devices. The existing wall switches were wired into binary input modules, so the switch layout stayed the same while the logic behind it moved to KNX. Lighting and blind circuits are driven through KNX actuators.

A touch panel handles light scenes and central control, and the house can also be managed remotely from phone and tablet. Because the panel is built as modules on DIN rail, adding devices later is a matter of extending the rail.

Engineering Highlights

  • Migration from a closed bus system to KNX
  • Existing wall switches retained via binary inputs
  • Lighting and blind control on a single backbone
  • Touch panel and mobile remote access